Monday, September 28, 2026ᐃᖃᓗᓐᓃᑦᑐᑦ. ᓄᓇᕗᒻᒥ ᑕᑯᓐᓇᓂᖅᓴᐅᔪᑦ.
ᓴᖅᑭᖅᑕᐅᓯᒪᔪᑦ ᓄᓇᕗᒻᒥᐅᑕᕐᓄᑦ
ᐃᖃᓗᐃᑦ2.6°CLight Rain and SnowWind SE 36 km/hFull forecast & boaters report →
Inuktitut navigation is available.

Stories are shown in English while Inuktitut story translation is paused.

Arctic Bay small-craft harbour work begins; mariners asked to give 100-metre berth

ᓇᐃᓈᕐᓗᒍ

Canadian Coast Guard NAVWARN NW-A-0245-26 says dredging and construction for Arctic Bay’s new small-craft harbour is scheduled daily from Aug. 30 to Sept. 10, from 10 a.m. to 11 p.m. UTC. Mariners are asked to remain 100 metres clear of the work areas; the notice says the areas will not be marked.

Share this briefingFacebookEmail

ᖃᓄᐃᓐᓂᖅᑲᑦ

The Coast Guard’s published navigation warning identifies two dredging areas and a separate dumping area in Arctic Bay. It says workers will monitor VHF Channel 77 during the daily work period and requests a 100-metre wide berth from vessels.

ᓱᒻᒪᑦ ᐱᒻᒪᕆᐅᒻᒪᖔᖅ

The notice provides time-sensitive marine-access information for vessels using Arctic Bay during active harbour construction. Because no markers will delimit the work areas, mariners need the NAVWARN coordinates and radio information to avoid the dredging and disposal zones.

ᖃᓅᓂᐊᓕᖅᑲᓕ

The warning remains in force until Sept. 11, 2026 at 00:00 UTC. It does not confirm that the small-craft harbour is complete, specify a harbour opening date or establish a formal marine closure.

ᐱᒻᒪᕆᐅᔪᑦ ᖃᐅᔨᒪᔭᐅᒋᐊᓖᑦ

Work period: 10:00–23:00 UTC daily, Aug. 30–Sept. 10. Area: Shipping Safety Control Zone 13—Arctic Bay; chart 7512. Vessel guidance: requested 100-metre berth and monitor VHF Channel 77 (156.875 MHz). The Coast Guard says there will be no markers delimiting the construction area.

Report an ErrorReviewed and approved for publication.
Verified community discussion

Comments

0 approved comments. Every comment is reviewed before appearing.

Real Facebook names
Start a useful, accountable discussion.

Comments appear here after identity verification and News Desk review.